Skip to main content
We're sorry but Envirofacts is not intended to work with Internet Explorer. Please switch to Chrome/Edge/Firefox or any modern browser to continue.
U.S. flag

An official website of the United States government

Here's how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock ( Lock A locked padlock ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Chemicals and Toxics
    • Climate Change
    • Emergency Response
    • Environmental Information by Location
    • Environmental Justice
    • Greener Living
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Pesticides
    • Radon
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Guidance
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • EPA Administrator
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History
    • Staff Directory
Related Topics:
  • Envirofacts
Contact Us
Home | Multisystem Search | Topic Searches | System Data Searches | About the Data | Data Downloads | Widgets | Services | Mobile | Other Datasets
 
Facility ID: 59101TRNSB1525L

Facility Name and Address:
LOVELAND PRODUCTS INC-BILLINGS (FORMERLY TRANSBAS)
1525 LOCKWOOD RD
BILLINGS, MT 59101

Parent Company: AGRIUM INC

Industry: Pesticide and Other Agricultural Chemical Manufacturing (325320)
Chemical: Methoxone

Reports:
View TRI Facility profile report for this facility
View TRI Form R submissions by this facility


*You can navigate within the map with your mouse.

Production Related Waste Management for Selected Chemical


Show P2 data for other chemicals at this facility:

lchemid=0000094746
Chart Options1:

*Additional chart options not available for multi-establishment facilities.

    Waste Management Comparison -



Find more P2 activities for this industry and chemical
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company


Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2017 Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas

Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Past efforts of recycling, dust collection and where possible dedication of equipment have been successfully implemented. Recycling is done under close scrutiny to avoid cross contamination or generating additional off spec material (resulting in waste). Any additional dedication of equipment would limit profitability.

Other Environmental Practices: Recycling - Recycle rinses in production when ever possible

Source Reduction: Source Reduction - Dust control, scheduling efficiencies

2016 Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas

Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Recycling and scheduling long runs are currently in place. Formulation of this ingredient continued to reduce in 2016.

2015 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
Source Reduction - Reduced product mix which not only reduced the quantity of this material used but also decreased the number of cleanouts, waste and the water treatment of streams with this constituent to virtually nothing.
Source Reduction - Employees at all levels seek ways to minimize change overs and cleanouts which create waste.

Other Environmental Practices: Source Reduction - Dedication of byproducts from other streams which allows for more recycling in compatible products.

Other Environmental Practices: Waste Treatment - Dedication of byproduct streams and improved preventative maintenance has reduced the amount of this material from the water stream that is treated. In 2015 this constituent did not enter the water treatment stream.

Other Environmental Practices: Recycling - Dedication of byproducts from other streams which allows for more recycling in compatible products.

2014 Source Reduction:: W49: Other raw material modifications
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Source Reduction - Segregated MCPA byproduct streams to recycle in compatible products while maintaining product integrity.

Other Environmental Practices: Recycling - Recycling is part of the culture of the facility and goes beyond regulated materials. Facility management includes recycling in production planning efforts, reports recycling achievements/opportunities to employees to maintain buy in and tracks recycling initiatives as a part of corporate sustainability goals.

2013 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W19: Other changes in operating practices


Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance
2012 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W19: Other changes in operating practices


Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance
W14: Long runs of compatible products were scheduled to minimize waste and maximize recycling.
W19: In 2012 LPI installed an automated control system that opened and closed valves, transferred materials, turn on and off agitators and pumps and set off overflow alarms.
W33: In 2012 LPI installed an automated control system that opened and closed valves, transferred materials, turn on and off agitators and pumps and set off overflow alarms.

Source Reduction - The vendor worked closely with operators and maintenance to develop checklists, perform maintenance and address concerns.
Source Reduction - A management of change and process hazard analysis were performed prior and during the installation of the auto system. Employees involved in the process, representing various levels and disciplines and the vendor were included in these reviews
Source Reduction - Employees were included throughout the installation of the automation system.
2011 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W68: Improved rinse equipment operation


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2010 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W68: Improved rinse equipment operation


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2009 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W68: Improved rinse equipment operation


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2008 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2007 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2006 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2005 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2002 Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2001 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1997 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1995 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.