Related Topics:
Facility ID: 36251WLBRNHWY77
Facility Name and Address: WELLBORN CABINET INC 38669 HWY 77 S ASHLAND, AL 36251 Parent Company: WELLBORN CABINET INC Industry: Wood Kitchen Cabinet and Countertop Manufacturing (337110) Chemical: Ethylbenzene Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0000100414
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Other Barriers to Source Reduction - An additional Automated Finishing Line is being installed and will be operational this year (2023). A solvent distilling operation is also being installed and will be operational this year. |
||
2021 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - RTO installed in 2018 to limit air emissions |
|
2020 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - Same comment as provided on Form R for Xylene |
|
2018 |
Barriers: B4-Barriers to P2 B4 - Source reduction activities were implemented but were unsuccessful.
|
Barriers to P2: B4 - Source reduction activities were implemented but were unsuccessful. - Reformulation of our main finishing materials was done to reduce HAPs content. Within 3 months we had issues in the field with sticky, uncured coatings. We had to go back to the original formulas. Source Reduction: Source Reduction - We have installed an RTO on a new finishing line. Stack testing indicates a DRE of over 98%. We are also going to try reformulation again but with more internal testing prior to release to manufacturing. |
|
2017 |
Other Barriers to Source Reduction - Study was underway but implementation will occur during 2018. Other Environmental Practices: Recycling - Distilling unit acquired for solvent recovery/recycling but not implemented yet. |
||
2016 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Same as Xylene |
|
2015 |
Other Environmental Practices: Recycling - We obtained a solvent recovery unit but have not installed it yet. We plan to install it this year. |
||
2014 |
Other Environmental Practices: Recycling - We did not implement the on-site recycling process during 2014 and are trying to get this done in 2015 although it may be 2016 before it is implemented. |
||
2013 |
Other Barriers to Source Reduction - We implemented recycling off-site during 2013 and will be implementing recycling on-site this year. We are also trying to substitute materials to decrease the use of this chemical. |
||
2012 |
Other Environmental Practices - We started moving from off-site energy recovery for spent solvents to off-site recycling. This year, 2013, all hazardous waste will be recycled off-site. We are still exploring methods for recycling on-site.
Other Barriers to Source Reduction - Finish formulation requirements. |