Related Topics:
Facility ID: 94070LTTNL960IN
Facility Name and Address: L-3 COMMUNICATIONS ELECTRON DEVICES DIV 960 INDUSTRIAL RD SAN CARLOS, CA 94070 Parent Company: L3 TECHNOLOGIES INC Industry: Other Electronic Component Manufacturing (334419) Chemical: Lead Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007439921
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2016 |
Source Reduction: Source Reduction - Source reduction plan established per California SB 14 |
||
2008 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction - L-3 completed the construction of a new cleaning and plating shop in June 2008. In August of 2008 the plating shop went to zero discharge, removing all discharges to the sewer, and the filter cake waste stream. |
2007 |
Source Reduction:: W51: Instituted recirculation within a process
Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W67: Improved rinse equipment design |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - L-3, edd started construction of a new cleaning and plating shop in 2007 which was completed in june of 2008. In 2007 l-3, edd eliminated its filter cake waste stream completely by removing the wastewater treatment unit associated with the old plating shop. In august 2008 the new shop will achieve a zero wastewater discharge status by utilizing closed loop ion-Exchange technology, eliminating all process wastewater discharges to the potw. |