Related Topics:
|
Facility ID: 67501JCKSN2600E
Facility Name and Address: JACKSON DAIRY 2600 E 4TH AVE HUTCHINSON, KS 67501 Parent Company: THE KROGER CO Industry: Fluid Milk Manufacturing (311511) Chemical: Ammonia Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007664417
| Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
| Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
|---|---|---|---|
| 2009 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T03: Materials balance audits |
Source Reduction - Jackson Dairy had some slow fugitive ammonia leaks in 2009. Our facility is constantly working on the reduction of these. |
| 2008 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T03: Materials balance audits |
|
| 2007 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
Source Reduction - In year 2007 jackson dairy conducted renovations to the facility. A new extended shelf-Life product line was installed for organic milk and soy. The facilities ammonia refrigeration system had to be expanded by $1.5 million dollars. There were many ammonia pump downs and tie-Ins required to complete the project, which cause most of the losses. The refrigeration system was expanded to include some new equipment; ammonia high recirculator, hvac, four direct expansion silos and a glycol chiller. |
| 1999 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
| 1998 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
| 1997 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
| 1996 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
| 1995 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
| 1994 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|