Facility Name and Address: CHAMPLAIN CABLE CORP 175 HERCULES DR COLCHESTER, VT 05446 Parent Company: NA Industry: Other Communication and Energy Wire Manufacturing (335929) Chemical: Antimony compounds Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N010
| Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
| Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
|---|---|---|---|
| 2021 |
Source Reduction:: S44: Other improvements to operating practices and training
|
Methods to Identify SR Opportunities: T11: Other
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
S44: Minimizing scrap compound during production. Source Reduction - Quality sets a recurring scrap and usage % target for the year and corrective actions are implemented as needed when scrap exceeds this set amount. Other Environmental Practices: Recycling - We have a project this year to determine opportunities for improving recyclability of our compound scrap at the scrap dealer's facility. Barriers to P2: B7 - No known substitutes or alternative technologies. - Because the reportable chemicals are part of the ingredients found in our compound formulations, there are not always alternative ingredients available to use. With that said, our Research & Development team does review formulations to determine when substitutions are available and feasible for a particular product. |
| 2020 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - Our product formulations utilize antimony trioxide as a fire retardant - no acceptable alternative exists. |
|
| 2019 |
Source Reduction: Source Reduction - Tightened production specifications to meet requisite design tolerances resulted in less raw material use. |
||
| 2018 |
Source Reduction: Source Reduction - Tightened production specifications to meet requisite design tolerances resulted in less raw material use. |
||
| 2017 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - Our product formulations utilize antimony trioxide as a fire retardant - no acceptable alternative exists. |
|
| 2016 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W14: cost reduction strategies to optimize production process and reduce change-overs and clean-outs. |
| 2015 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
W49: Optimize use of compound to achieve desired perfromance |
| 2014 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction: Source Reduction - Utlized efforts to improve production efficiency and reduce scrap. Instituted a bonus program for operators that achieve scrap reduction goals. |
| 2013 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - An operations team was established to develop a more efficient production schedule to reduce the number and frequency of machine changeovers. By reducing the number of changeovers, he volume of waste has significantly reduces. A 50% reduction in off-site transfers was realized, compared to only a 17% reduction in production volume. |
| 2012 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
| 2011 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
| 2010 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
| 2009 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
| 2008 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
Other Environmental Practices - We started recycling all of our compound purgings in november 2007 |
| 2007 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
Other Environmental Practices - We started recycling all of our compound purgings in november 2007 |
| 2006 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
Source Reduction - We added new concentrate feeders and incorporated lean manufacturing to reduce the amount of purging necessary. |