Related Topics:
|
Facility ID: 48843VRSTR3075W
Facility Name and Address: ANTOLIN HOWELL 3705 W GRAND RIVER AVE HOWELL, MI 48855 Parent Company: GRUPO ANTOLIN NORTH AMERICA INC Industry: Motor Vehicle Seating and Interior Trim Manufacturing (336360) Chemical: Diisocyanates Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N120
| Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
| Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
|---|---|---|---|
| 2024 |
Source Reduction:: S06: Other material modifications made[-0-4%]
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
S06: Added dry air to system to ensure quality life of chemical use and storage Source Reduction - Added dry air system to ensure quality life of chemical use and storage Barriers to P2: B7 - No known substitutes or alternative technologies. - |
| 2023 |
Source Reduction:: S06: Other material modifications made
|
Methods to Identify SR Opportunities: T04: Participative team management
Barriers: B7-No Information B7 - No known substitutes or alternative technologies. |
S06: Ensuring training and production preventive maintenance systems are adequate. |
| 2021 |
Source Reduction:: S35: Other improvements to inventory and material management[-5-14%]
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
S35: Our facility is storing less safety stock onsite for emergency use. This is to ensure reduced outdated product. Source Reduction - Daily monitoring of production chemical amounts |
| 2019 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Product that becomes waste is produced by flushing the chemical transfer tanks for periodic cleaningConcern that product quality may decline as a result of source reduction. |
|
| 2018 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - Waste is generated during flush of chemical tank. This is done when there are production issues or during preventative maintenance. It is a necessary part of the process. |
|
| 2009 | Source Reduction - Some unused Iso that is not suitable for production needs is sold and reused for other manufacturing facilities | ||
| 2008 | Source Reduction - Some unused Iso that is not suitable for production needs is sold and re-used for other manufacturing facilities. | ||
| 2001 |
Source Reduction:: W39: Other spill or leak prevention
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
| 2000 |
Source Reduction:: W39: Other spill or leak prevention
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
| 1999 |
Source Reduction:: W39: Other spill or leak prevention
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
| 1998 |
Source Reduction:: W39: Other spill or leak prevention
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
| 1997 |
Source Reduction:: W39: Other spill or leak prevention
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|

