Related Topics:
Facility ID: 38063SRFTNOLDHI
Facility Name and Address: SRG GLOBAL COATINGS LLC 2483 HWY 209 N RIPLEY, TN 38063 Parent Company: KOCH INDUSTRIES INC Industry: Electroplating, Plating, Polishing, Anodizing, and Coloring (332813) Chemical: Nickel compounds Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N495
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2014 |
Source Reduction: Source Reduction - Implemented total preventive maintenance program to reduce leaks |
||
2012 |
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
W36: Measure the amount of metal lost each day and report. Source Reduction - Have external engineers audit facility to look for tank leaks and structural integrity of tanks. Source Reduction - Have formed metal loss team that meets to come up with new ideas to reduce metal losses. Source Reduction - Do very regular inspections looking for potential leaks. Source Reduction - Have metal loss program in place that measure the amount of metal lost to wastewater treatment in both dollars and pounds. Non-production losses continue to be a significant source. Installing new storage tanks with sloped bottoms so all solution can be pumped out before cleaning. Have goal set to reduce total nickel discharge to POTW to <3 lbs/month. Have made significant progress in last year. Will have to reduce the total volume of discharge by > 20% to meet final goal. |
2011 | Source Reduction - Tracking metal losses in plating operation. Working on reducing losses of metal at the source. |