Related Topics:
Facility ID: 0610WMTTCR84SPR
Facility Name and Address: MOTT METALLURGICAL CORP 84 SPRING LN PLAINVILLE, CT 06062 Parent Company: Industry: Powder Metallurgy Part Manufacturing (332117) Chemical: Nickel compounds Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N495
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2021 |
Source Reduction:: S21: Optimized process conditions to increase efficiency
|
Methods to Identify SR Opportunities: T11: Other
|
S21: Mott continuously looks to improve the process for the best desired outcome with least volume of loss to a very expensive raw material. |
2020 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Other Environmental Practices: Recycling - A new recycling company was used in 2020 as compared to 2019. Source Reduction: Methods for Identifying Pollution Prevention Opportunities - Steel powders of various formulation compositions are placed under pressure and heat simultaneously to form a gas diffusion filtration device. The precise formula or range of constituent concentrations may be specified by the customer therefore Mott is not able to vary the formula;a without customer approval. The process/technique for production is standard and not feasible alternatives appear to be available. Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Customers specify blend of metal composition and sales will yield an increase or decrease in volume. Composition cannot be changed without customer's approval. |
|
2019 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes. |
Barriers to P2: B8 - A reduction does not appear to be technically feasible - The composition of the gas diffusion filter is specified by various ASTM Standards, or specific customer specs, therefore Mott may not vary the starting powder composition without customer approval. Source Reduction: Methods for Identifying Pollution Prevention Opportunities - An outside Consulting/Engineering Firm has been engaged to provide assistance with improved inventory management and control to reduce the amount of material deemed scrap from this specific process. Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Steel powders of various formulation compositions are placed under pressure and heat simultaneously to form a gas diffusion filtration device. The precise formula or range of constituent concentrations may be specified by the customer, or ASTM standards therefore Mott is not able to vary the formula without customer engineering requests/approvals. The process/technique for production is standard, and no feasible alternatives appear to be available. |
|
2018 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Other Environmental Practices: General Environmental Management - Consultant has advised better documentation for subsequent reporting years. Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Company not aware of any technique available to minimize the emissions from furnace at this time. The emissions seem fairly low overall. |
|
2017 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Company is not aware of what can be done to reduce waste generated. Other Environmental Practices: General Environmental Management - Hired Environmental Consulting Firm to move forward with Pollution Prevention opportunities for future. Consultant has suggested improvements in inventory/material usage documentation. |
|
2016 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Company not aware of PP techniques for this process. Other Environmental Practices: General Environmental Management - Hired Engineering Consultant for Assistance |
|
2015 |
Other Environmental Practices: General Environmental Management - Consultants used to provide inventory management assistance. |
||
2014 |
Other Environmental Practices: General Environmental Management - Hired Outside Consultants to assist with Environmental management activities and reporting obligations. |