Facility ID: 03062TRDYN4PITT
Facility Name and Address: AMPHENOL APC INC 91 NORTHEASTERN BLVD NASHUA, NH 03062 Parent Company: AMPHENOL CORP Industry: Bare Printed Circuit Board Manufacturing (334412) Chemical: Certain glycol ethers Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N230
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Source Reduction:: S05: Modified content, grade, or purity of a chemical input[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction. |
S05: Evaluate effectiveness of production chemicals that do not contain or have a reduced concentration of Glycol ethers. Source Reduction - Process engineering group working to identify potential replacement of reduction for processes that containing certain glycol ethers. Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Determination of effectiveness will be crucial to developing replacements. |
2021 |
Source Reduction:: S35: Other improvements to inventory and material management
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction. |
S35: Set inventory levels for specific materials. Due to supply chain issues some materials expired due to ordering excess amounts to ensure having it on hand. Source Reduction - Group compared lead times and usage to determine inventory levels. Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Increased usage for 2021 was driven by quality issues due to contaminant redepositing on product. Also experienced process upsets that required dumping and remaking a bath more frequently than desired. |
2020 |
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction - Production group (Engineer and operators) are working to minimize material expiring before full use Other Barriers to Source Reduction - Use of Glycol ether bearing materials is determined by customer requirements for products manufactured in the reporting year. This results in a variation based on products manufactured. |
2019 |
Source Reduction:: W19: Other changes in operating practices[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction. |
W19: Changed criteria for bath changes to extent bath life, reducing dump and remakes Source Reduction - Worked with production engineer to determine ablility to extend bath life Source Reduction - Production engineer recommended criteria allowing for bath extension Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Product criteria is the only consideration if a bath needs to be dumped earlier than current criteria dictates |
2018 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
Source Reduction:: W22: Began to test outdated material - continue to use if still effective |
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
W21: Inventory quantities have been evaluated and reduced to help off set potential for expiring shelf life. W22: Pastes and inks are being evaluated to use beyond expiration date. Source Reduction - Working with vendor to ensure availability of material due to reduced inventory Source Reduction - Amphenol APC is conducting work to reduce waste and in turn reduce costs associated with replacement and disposal. |
2017 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
|
Methods to Identify SR Opportunities: T10: Vendor assistance
|
Source Reduction - Working with vendor to get extensions beyond initial expiration date |
2016 |
Source Reduction:: W19: Other changes in operating practices[-0-4%]
Source Reduction:: W22: Began to test outdated material - continue to use if still effective[-0-4%] Source Reduction:: W73: Substituted coating materials used[-0-4%] |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T04: Participative team management |
W19: Removed some materials from processes when not in use to minimize loss W22: Materials approaching expiration are tested , if they pass a new expiration date is given to extend use. W73: Where possible and with customer approval we will utilize material with lower concentration or no Glycol ethers Source Reduction - Our product managers will work with customers to see if substitution can be approved Source Reduction - Material which is used intermittently would experience loss of effectiveness, we now containerize when not in use to reduce this loss Source Reduction - Work with vendors should a material come close to expiration |
2015 |
Source Reduction:: W22: Began to test outdated material - continue to use if still effective[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction - Amphenol APCBT manufactures product on customer requirements, creating variability in process (some product requires a large amount of material while others do not. We continue to work at minimizing material use. |
2014 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures[-0-4%]
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond[-0-4%] Source Reduction:: W22: Began to test outdated material - continue to use if still effective[-0-4%] |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance |
W13: We continue to work towards refining our processes to reduce waste and extend the life of our chemistry. Retesting of materials that expire to evaluate continued use.Working on reducing inventory to a JIT schedule. |
2013 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other |
|
2012 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other |
Source Reduction - Work conducted to extend bath life in processes. Therefore reducing frequency of dump and remakes Source Reduction - Team consists of EHS, Upper management, Engineering and line operators |
2011 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W14: Evaluated PM schedule and discovered that PM''s were not controlled by discrete values. Some PMs were conducted solely as a convience. Team set specific triggers to allow PM actions |
2008 | Source Reduction - CHANGE IN SOLDERMASK USED IN PROCESS. Incorporated new processes in 2008 need to review in 2010 reporting (RY2009) | ||
2007 |
Source Reduction:: W89: Other product modifications
|
Methods to Identify SR Opportunities: T11: Other
|
Source Reduction - Change in soldermask used in process. |
2001 |
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
|
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
|
|
1995 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T10: Vendor assistance
|