Related Topics:
Facility ID: 06492MRCNCSOUTH
Facility Name and Address: ALLNEX USA INC. WALLINGFORD CT SITE 528 SOUTH CHERRY STREET WALLINGFORD, CT 06492 Parent Company: ALLNEX USA INC Industry: Plastics Material and Resin Manufacturing (325211) Chemical: n-Butyl alcohol Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0000071363
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2020 |
Source Reduction:: W51: Instituted recirculation within a process
Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2019 |
Source Reduction:: W35: Installed vapor recovery systems
Source Reduction:: W39: Other spill or leak prevention Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
W35: 2nd layer of Balls on EQ W39: Tankwagon loading stalls spill containment controls W51: Capturing the 4th wash on NF2000 to reuse in next batch W58: Better processing of Butanol thru the Mars column, recovers more, less to WWTP |
2018 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W58: Altered NF2000 distillate treatment method to recover more Butanol |
2017 |
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
W52: Completed installation of containment measures and other spill prevention engineering controls. Finished adding press valves to B6 presses to prevent mis-directed flow W58: Reduced double filtering in B6 Reactors - less cleanouts B6 resins. Re-programmed C3 water column bottoms temperature controller so it can be run in Auto. |
2016 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2015 |
Source Reduction:: W39: Other spill or leak prevention[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2014 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W58: Use of centrifuge or bag filter in lieu of plate and frame filter press |
2013 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W39: Other spill or leak prevention Source Reduction:: W51: Instituted recirculation within a process |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T03: Materials balance audits |
Other Environmental Practices - Instituted campaigning to reduce the frequency of washouts. Installed automatic valve routing to reduce likelihood of diversions to the industrial sewer. |
2010 |
Source Reduction:: W49: Other raw material modifications
Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2009 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2008 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W39: Other spill or leak prevention |
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2007 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W39: Other spill or leak prevention |
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2006 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
|
|
2005 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
|
|
2004 |
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W64: Improved draining procedures |
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
|
2003 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W51: Instituted recirculation within a process |
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T04: Participative team management |
|
2002 |
Source Reduction:: W51: Instituted recirculation within a process
|
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
|
|
2001 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2000 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T11: Other
|
|
1999 |
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding
|
Methods to Identify SR Opportunities: T11: Other
|
|
1998 |
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding
|
Methods to Identify SR Opportunities: T11: Other
|
|
1992 |
Source Reduction:: W68: Improved rinse equipment operation
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |