Related Topics:
Facility ID: 15301WSTPN2833W
Facility Name and Address: WEST PENN WIRE/CDT - WA 2833 W CHESTNUT ST WASHINGTON, PA 15301 Parent Company: BELDEN INC Industry: Other Communication and Energy Wire Manufacturing (335929) Chemical: Antimony compounds Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N010
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2021 |
Other Barriers to Source Reduction - PRODUCTION WAS SCHEDULED TO BE SHUTDOWN AT END OF 2021 |
||
2020 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W52: INSTALLED NEW MACHINERY Source Reduction: Source Reduction - We initiated various counter measures to our scrap rate. In 2019 our yearly average scrap rate was 10.5%, in 2020 we brought it down to 8.67% |
2019 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W52: ADDED (EXBOX) ON-LINE TAKE-UP TO JACKETING LINE. IMPLEMENTED OPERATOR CHECKLIST FOR PROPER MACHINE SETUP. 2019 SCRAP RATE WAS 10.5% AND 2020 SCRAP RATE IS 8.5% AT TIME OF THIS REPORT. Source Reduction: Source Reduction - LEAN DAILY MANAGEMENT AND LEAN MANUFACTURING PRINCIPLES |
2018 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W19: THERE WERE NO CAPITAL PROJECTS IDENTIFIED AND IMPLEMENTED IN 2018. THE FACILITY USES LEAN MANUFACTURING PRINCIPLES TO IDENTIFY SCRAP GENERATION ISSUES. Source Reduction - LEAN DAILY MANAGEMENT AND LEAN MANUFACTURING PRINCIPLES |
2017 |
Other Barriers to Source Reduction - THERE WERE NO CAPITAL PROJECTS IDENTIFIED AND IMPLEMENTED IN 2017. THE FACILITY USES LEAN MANUFACTURING PRINCIPLES TO IDENTIFY SCRAP GENERATION ISSUES. Source Reduction: Source Reduction - THE FACILITY USES LEAN MANUFACTURING PRINCIPLES TO IDENTIFY SCRAP GENERATION ISSUES. |
||
2016 |
Other Barriers to Source Reduction - THERE WERE NO CAPITAL PROJECTS IDENTIFIED IN AND IMPLEMENTED IN 2016 |
||
2015 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T11: Other
|
W52: FACILITY UPGRADED TURNINGPOINT MACHINE # 2 GIVING IT THE CAPABILITY TO RUN SHIELDED PRODUCTS THAT ARE MANUFACTURED ON THE TRADITIONAL MACHINES. THIS REDUCES SCRAP GENERATION FROM 1 - 5% Other Environmental Practices - THE FACILITY USES LEAN MANUFACTURING TECHNIQUES TO DRIVE CONTINOUS IMPROVEMENT AND REDUCE WASTE THROUGHOUT THE MANUFACTURING PROCESS |
2014 |
Source Reduction:: W29: Other changes in inventory control
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T11: Other |
Source Reduction - Lean manufacturing principles and manufacturing process scrap reductions are primary focus for source reductions |
2013 |
Source Reduction:: W51: Instituted recirculation within a process
|
Methods to Identify SR Opportunities: T11: Other
|
Other Environmental Practices - Lean manufacturing principles |
2012 |
Source Reduction:: W51: Instituted recirculation within a process
|
Methods to Identify SR Opportunities: T11: Other
|
|
2011 |
Source Reduction:: W51: Instituted recirculation within a process
|
Methods to Identify SR Opportunities: T11: Other
|
W51: Regrind bleedout plastic scrap and reuse in production process Source Reduction - Regrind bleedout plastic scrap and reuse in production process |