Related Topics:
Facility ID: 28787RLNCLREEMS
Facility Name and Address: DODGE MECHANICAL POWER TRANSMISSION CO 70 REEMS CREEK RD WEAVERVILLE, NC 28787 Parent Company: RBC BEARINGS INC Industry: Mechanical Power Transmission Equipment Manufacturing (333613) Chemical: Lead Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=007439921
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Process that uses this component was previously converted to a tin based material. |
|
2021 |
Source Reduction:: S03: Substituted raw materials, feedstock, or reactant chemical
|
Methods to Identify SR Opportunities: T10: Vendor assistance
|
Source Reduction - Removed lead from our production processes. Still working on removing residue from our equpment. |
2020 |
Source Reduction:: W71: Other cleaning and degreasing modifications
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W71: Have stopped using lead in our process. Still working on removing residue from machines. |
2018 |
Source Reduction:: W42: Substituted raw materials[-50-99%]
|
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |
W42: Removed Lead from products being manufactured and replaced with Tin. Source Reduction - Product Engineering along with Plant Engineering |
2017 |
Source Reduction:: W42: Substituted raw materials
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W42: We are replacing the leaded portion of this product with tin. |
2016 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T11: Other
|
W58: Improved process to minimize rework and scrap material. Source Reduction - Quality Inspection |
2014 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
W58: Continued to improve processes to minimize the amount of product that has to be used for rework. Source Reduction - Housekeeping practices are in place to minimize the opportunity for materials to reach the environment. |
2013 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T11: Other |
W58: Process improvements were implemented to minimze use of excessive materials due to rework operations. Source Reduction - Indoor and Outdoor housekeeping improvments were implemented to minimize the opportunity for materials to reach the environment. |
2012 |
Source Reduction:: W71: Other cleaning and degreasing modifications
|
Methods to Identify SR Opportunities: T11: Other
|
W71: Increased cleaning frequency for aisleways to minimize track out of materials. |
2011 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T11: Other
|
|
2010 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance |
Other Environmental Practices - The product line containing lead was moved to our location in mid 2009. Initial testing indicated that we were emitting lead via the exhaust stacks coming from the molten metal furnace. A Torit dust collector was intalled and became operational in late June, 2010. Testing indicates that this has resulted in a 99% drop in lead emissions from this process. |
2009 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance |
Other Environmental Practices - This product came into our facility in the second half of 2009. We have identified the exhausts that vent through the roof from the molten metal tanks as being the source of the lead emissions that are reflected in our air emissions reporting and the stormwater release. We have went through the quoting and approval process to obtain an air filtration system from Torit Industries that is said to be 99.9% effective at removing lead emissions. This system should be installed and operational by 7/15/2010. |