Facility Name and Address: BATESVILLE MANUFACTURING LLC 175 MONOGARD DR MANCHESTER, TN 37355 Parent Company: HILLENBRAND INC Industry: Burial Casket Manufacturing (339995) Chemical: Certain glycol ethers Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N230
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2019 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis[-15-24%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
W50: Improved rerun system, reduced the amount of times a part gets clear coat on it. Source Reduction - Employees from throughout facility had input on rerun system. Source Reduction - Kaizen analysis of process. Other Environmental Practices: Recycling - Send flush solvents off site to be reclaimed |
2018 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Other Environmental Practices: Recycling - Color change solvents are recycled. Barriers to P2: B8 - A reduction does not appear to be technically feasible - Manufacturer has improved paint in the past. Further improvements are not technically feasible. |
|
2017 |
Barriers: B1-Barriers to P2 B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat
|
Barriers to P2: B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat - Reduced VOC surface coating material would be too expensive and reduce companies ability to be competitive in the global economy. |
|
2016 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management |
W52: PAINT BOOTH TO SPOT REPAIR DEFECTS Source Reduction - TEAM IMPLEMENTED PROJECT Source Reduction - VENDOR HELP DESIGN BOOTH LAYOUT |
2015 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Source Reduction: Source Reduction - Reduce paint usage through team management and better preventive maintenance. Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Major component of paint formulation |
|
2014 |
Other Barriers to Source Reduction - Increase paint usage is due to quality defect, dirt in the paint process. Efforts to gain control over the dirt problem have been unsuccessful to date. Dirt problems have resulted in rework and scrap of finished product. Efforts to eliminate the dirt problem are ongoing. Other Environmental Practices: Recycling - Currently recycle paint line flush solvent approximately 20,000 gallons per year. |
||
2013 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance |
W19: Institued batching of product, increased first pass yeld Source Reduction - Administrative controls have reduced color changes and increase first pass yield. Source Reduction - Robot vendor work with paint shop to refine process Source Reduction - New process in 2011/2012, working out bugs in 2013 |
2012 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
|
|
2001 |
Source Reduction:: W78: Other surface preparation and finishing modifications
|
Methods to Identify SR Opportunities: T11: Other
|
|
2000 |
Source Reduction:: W78: Other surface preparation and finishing modifications
|
Methods to Identify SR Opportunities: T11: Other
|
|
1998 |
Source Reduction:: W82: Modified design or composition of product
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
1994 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits |
|
1993 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
|
1992 |
Source Reduction:: W42: Substituted raw materials
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance |
|
1991 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |