Related Topics:
Facility ID: 43207FRNKL2020B
Facility Name and Address: FRANKLIN INTERNATIONAL 2020 BRUCK ST COLUMBUS, OH 43207 Parent Company: NA Industry: Adhesive Manufacturing (325520) Chemical: N-Methyl-2-pyrrolidone Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0000872504
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2015 |
Source Reduction:: W24: Instituted better labeling procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W24: Introduced a new waste labeling system that allows for better overall management of waste. This system allows each waste container to be tracked electronically while being accumulated on-site. |
2013 |
Other Barriers to Source Reduction - Pollution prevention previously implemented- additional reduction does not appear technically or economically feasible. |
||
2012 |
Source Reduction:: W71: Other cleaning and degreasing modifications
|
Methods to Identify SR Opportunities: T11: Other
|
Source Reduction - Material is re-use for cleaning until no longer effective. Less material was used for cleaning in 2012 (vs 2011) |
2004 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2002 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T11: Other
|
|
2001 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
|
Methods to Identify SR Opportunities: T04: Participative team management
|