Related Topics:
Facility ID: 44004DTRXC1100N
Facility Name and Address: DETREX 1100 STATE RD ASHTABULA, OH 44004 Parent Company: DETREX CORP Industry: Other Basic Inorganic Chemical Manufacturing (325180) Chemical: Chlorine Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007782505
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2019 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - Chlorine is needed to make hydrochloric acid. |
|
2018 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - The reaction of hydrogen and chlorine can't be changed. |
|
2016 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2015 |
Barriers: B7-Source Reduction B7 - No known substitutes or alternative technologies.
|
Other Environmental Practices - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control, production planning, proper inventory management techniques, process improvement meetings with total employee involvement to eliminate manufacturing of off specification materials, and predictive maintenance along with preventive maintenance. We are also ISO 14001 and ISO 9001 certified, and have a mercury PMP program in place. Both IS 14001 and ISO 9001 drive our waste reduction and pollution prevention activities.
Source Reduction: B7 - No known substitutes or alternative technologies. - Best management practices are used to reduce the amount of chlorine loss. No known procedures are available to eliminate losses totally. |
|
2014 |
Source Reduction: Methods for Identifying Pollution Prevention Opportunities - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control, production planning, proper inventory management techniques, process improvement meetings with total employee involvement to eliminate manufacturing of off specification materials, and predictive maintenance along with preventive maintenance. We are also ISO 14001 and ISO 9001 certified, and have a mercury PMP program in place. Both ISO 14001 and ISO 9001 drive our waste reduction and pollution prevention activities. |
||
2013 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2012 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control improving production planning, proper inventory management techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance and predictive maintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury PMP program. Both ISO 14001 and ISO 9001 drive our efforts for continuous improvement in day to day activities for waste reduction and pollution prevention. |
2011 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control improving production planning, proper inventory management techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance and predictive maintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury PMP program. Both ISO 14001 and ISO 9001 drive our efforts for continuous improvement in day to day activities for waste reduction and pollution prevention. |
2010 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control improving production planning, proper inventory management techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance and predictive maintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury PMP program. Both ISO 14001 and ISO 9001 drive our efforts for continuous improvements in day to day activities for waste reduction and pllution prevention. |
2009 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control, improving production planning, proper inventory management techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance and predictive manintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury PMP program. Both ISO 14001 and ISO 9001 drive our efforts for continuous imporvements in day to day activities for waste reduction and pollution prevention. |
2008 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T09: Trade association/industry technical assistance program Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control, improving production planning, proper inventory managment techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury pmp program. Both ISO 14001 and ISO 9001 drive our efforts for continuous improvement in day to day activities for waste reduction and pollution prevention. |
2007 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T09: Trade association/industry technical assistance program Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
Source Reduction - Waste reduction and pollution prevention activities include but are not limited to research and development efforts for process improvements and control, improving production planning, proper inventory managment techniques, process improvement meetings with all employee involvement to eliminate manufacturing of off specification materials, and preventive maintenance. We are also ISO 14001 certified, ISO 9001 certified, and have a mercury pmp program. Both ISO 14001 and ISO 9001 drive our effort for continuous improvement in day to day activities for waste reduction and pollution prevention. |
2006 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T09: Trade association/industry technical assistance program Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2005 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T09: Trade association/industry technical assistance program Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T09: Trade association/industry technical assistance program |
|
2004 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2003 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2002 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2001 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
2000 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
1999 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other |
|
1998 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
1997 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
1996 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
1995 |
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
|
1994 |
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
|
1993 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
1992 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
1991 |
Source Reduction:: W52: Modified equipment, layout, or piping
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|