Facility Name and Address: ALBCO FOUNDRY INC 230 W MAPLE ST LISBON, OH 44432 Parent Company: Industry: Other Nonferrous Metal Foundries (except Die-Casting) (331529) Chemical: Aluminum (fume or dust) Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007429905
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Source Reduction:: S42: Changed production schedule to minimize equipment and material changeovers
|
Methods to Identify SR Opportunities: T04: Participative team management
Barriers: B1-No Information B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat |
S42: Try to run all aluminum together (Multiple Orders) Source Reduction - Team Lead reviews schedule to best optimize the casting process. |
2021 |
Source Reduction: Source Reduction - Replaced all filters on dust collector to increase capture. |
||
2020 |
Barriers: B1-Barriers to P2 B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat
|
Barriers to P2: B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat - We do not have the capital to proceed. Source Reduction: Source Reduction - We continue to find ways to reduce the source within an economical reason. |
|
2019 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - In 2019 we eliminated a stack of 20+ yearsand installed a fume collection system at our furnace. |
|
2018 | Other Environmental Practices - Albco is currently working on reducing fume escape by eliminating piping fume draw to stack to a collection point for recycling. Estimated completion mid 2020. | ||
2017 |
Other Environmental Practices: Recycling - We recycled 1,785 pounds of aluminum that we could not melt and cast as finish product in 2017. |