Related Topics:
Facility ID: 45661SDPRT3930U
Facility Name and Address: US DOE PORTSMOUTH GASEOUS DIFFUSION PLANT 3930 US RT 23 S PIKETON, OH 45661 Parent Company: US DEPARTMENT OF ENERGY Industry: Other Basic Inorganic Chemical Manufacturing (325180) Chemical: Hydrogen fluoride Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007664393
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2020 |
Source Reduction: Ways P2 Was Incorporated in Original Process Design - Production Stack emissions are >99.9% efficient. HF tank emissions are >97.5% efficient, and the uncontrolled potential to emit isminimal. |
||
2019 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Other Barriers to Source Reduction - Process changes to eliminate the liquid end product have been investigated, but does not appear economically viable. This change (even if implemented) would not eliminate the stack emissions. Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Production Stack emissions are >99.9% efficient. HF tank emissions are >97.5% efficient, and the uncontrolled potential to emit is minimal. |
|
2018 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Production stack emissions are >99.99 efficient. Hydrogen fluoride tank emissions are >97.5 efficient and the uncontrolled potential to emit is minimal. |
|
2016 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Production stack emissions are >99.99 efficient. HF tank emissions are >97.5 efficient and the uncontrolled potential to emit is minimal anyway. |