Production Related Waste Management for Selected Chemical
lchemid=0000067561
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2021 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - The process is designed to use the minimum amount of material possible. |
|
2020 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - The process is designed to use the minimum amount of material possible. Source Reduction: Ways P2 Was Incorporated in Original Process Design - The process is designed to use a minimal amount of material |
|
2019 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes. |
Barriers to P2: B8 - A reduction does not appear to be technically feasible - The process is designed to use the minimum amount of material possible. Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - Process is designed to minimize the amount of material used. Source Reduction: Ways P2 Was Incorporated in Original Process Design - Process is designed to minimize the amount of material used. |
|
2018 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - Process is designed to minimize the amount of material used. Source Reduction: Ways P2 Was Incorporated in Original Process Design - Process is designed to minimize the amount of material used. |
|
2017 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Reduction in the use of Methanol is no longer economically feasible |
|
2014 |
Barriers: B5-Barriers to P2 B5 - Specific regulatory/permit burdens.
|
Barriers to P2: B5 - Specific regulatory/permit burdens. - Once we received FDA approval to manufacture this material it is/must be made the same ever production process as required by law. |
|
2013 |
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management |
|
2012 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
2011 |
Source Reduction:: W29: Other changes in inventory control
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
Source Reduction - We are now using a new computer system for inventory control |
2010 |
Source Reduction:: W89: Other product modifications
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other |
|
2009 |
Source Reduction:: W29: Other changes in inventory control
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2008 |
Source Reduction:: W67: Improved rinse equipment design
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2007 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2006 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2005 |
Source Reduction:: W35: Installed vapor recovery systems
Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T11: Other |