Related Topics:
Facility ID: 53916DVNCP201IN
Facility Name and Address: BURGESS-NORTON MANUFACTURING CO PLANT 4 201 INDUSTRIAL DR BEAVER DAM, WI 53916 Parent Company: AMSTED INDUSTRIES INC Industry: Powder Metallurgy Part Manufacturing (332117) Chemical: Copper Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007440508
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2019 |
Other Environmental Practices: Recycling - All reclaimable powder metal and scrap is recycled. |
||
2013 |
Other Barriers to Source Reduction - Copper is in the nonconforming pieces which are sent offsite. Projects to reduce nonconforming pieces is always underway. |
||
2012 |
Other Barriers to Source Reduction - Copper powder becomes an article component of the piece manufactured. The piece cannot be made without copper powder and as a result there is no way to reduce the % of copper without changing the characteristics of the piece. |
||
2011 | Barriers to P2 - The pieces produced at the facility vary significantly in elemental composition. Some pieces will not contain any copper while others will contain a significant amount; depending on the targeted metallurgical properties. In addition, the facility manufactures many different pieces and some piece programs stop while new programs are added. The tremendous variance in piece programs and elemental composition affect the amount of copper used and recycled each year and the volume maybe in contrast to the overall business. | ||
2007 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Other Environmental Practices - Emphasis has been placed on the reduction off-Site transfers to recyclers. |