Related Topics:
Facility ID: 59101TRNSB1525L
Facility Name and Address: LOVELAND PRODUCTS INC-BILLINGS (FORMERLY TRANSBAS) 1525 LOCKWOOD RD BILLINGS, MT 59101 Parent Company: AGRIUM INC Industry: Pesticide and Other Agricultural Chemical Manufacturing (325320) Chemical: 2,4-D 2-ethylhexyl ester Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0001928434
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2017 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Other Barriers to Source Reduction - Cleanouts to address cross contamination have increased. These cleanouts as well as other activities that might cause contamination have increased waste disposal. Other Environmental Practices: Recycling - Recycle in compatible products Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Recycling of byproduct from 2,4D 2EH ester production is frequently recycled in compatible products. In 2017 consumer demand was higher for products containing 2,4D 2EH ester than the products the 2,4D 2 EH ester byproduct is recycled in creating a surplus of byproduct. Disposal of excess byproduct was required. |
|
2016 |
Barriers: B2-Barriers to P2 B2 - Require technical information on pollution prevention techniques applicable to specific production processes.
|
Barriers to P2: B2 - Require technical information on pollution prevention techniques applicable to specific production processes. - improve technology to improve byproduct quality in order to use more byproduct Other Environmental Practices: Recycling - recycle material into compatible products |
|
2015 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other |
W13: Management reduced the number of products formulated and packaged which reduced changeovers and waste. Source Reduction - New vessel and pipework installed Source Reduction - Employees actively reporting leaks, and repairs. Preventative maintenance improvements. Source Reduction - Employees at all levels participated in reducing changeovers.Management reduced the number of products formulated and packaged which reduced the number of changeovers. Source Reduction: Source Reduction - Timely addressing leaks and maintenance issues.Reduced product mix which results in less changeovers and waste. Other Environmental Practices: General Environmental Management - Employee participation in leak reporting. |
2014 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction - Reviewed byproduct stream to determine additional recycling opportunities resulting in further segregating byproduct streams. Other Environmental Practices: Recycling - Recycling is part of the culture of the facility and goes beyond regulated materials. Facility management includes recycling in production planning efforts, reports recycling achievements/opportunities to employees to maintain buy in and tracks recycling initiatives as a part of corporate sustainability goals. |
2013 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2012 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T10: Vendor assistance |
W14: LPI scheduled long runs of compatible products to minimize cleanouts and potential cross contamination. The scheduling of compatible streams inhanced recycling opportunities. W33: Installed an automation control system that minimizes human error potential and possible overflow of tanks as well as potential mistakes that would result in waste. Source Reduction - A process hazard analysis was completed to address process, safety and environmental concerns. Employees were part of the pha team. Source Reduction - The vendor was a part of the process hazard analysis team and worked with maintenance and employees to include procedures, maintenance and controls. |
2011 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other |
|
2010 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
2009 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
2008 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2007 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W19: Other changes in operating practices |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
2006 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2005 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W29: Other changes in inventory control |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
2002 |
Source Reduction:: W19: Other changes in operating practices
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2001 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T11: Other
|
|
2000 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |
|
1999 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |
|
1998 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |
|
1997 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |
|
1996 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W54: Instituted better controls on operating bulk containers to minimize discarding |
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management |