Related Topics:
Facility ID: 60156DVNCD14WAL
Facility Name and Address: ADVANCED FLEXIBLE COMPOSITES INC 14 WALTER CT LAKE IN THE HILLS, IL 60156 Parent Company: NA Industry: Rubber and Plastics Hoses and Belting Manufacturing (326220) Chemical: Toluene Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0000108883
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2021 | |||
2018 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - ADHESIVE ARRIVES PREMIXED TO COATING CONSISTENCY FROM SUPPLIER. WORKS GOOD THE WAY IT IS. |
|
2017 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Smooth characteristics of the product are dependent on thinning down the coating with fast solvents. |
|
2016 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Improved Heat Exchange device this year. Old one had reached age limit. New one is more efficient, better design. |
|
2015 |
Barriers: B6-No Information B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Source Reduction: Energy Recovery - New heat exchangers to be installed with higher efficiency |
|
2012 |
Other Barriers to Source Reduction - 6. Pollution prevention previously implemented- additional reduction does not appear technically or economically feasible |
||
2007 | Source Reduction - We are no longer using toluene for blending with our adhesives. Only the toluene included in the adhesives as prepared by our supplier will be used in the future. |