Facility Name and Address: CENTURY PRODUCTS INC. 2901 BELMEADE DR CARROLLTON, TX 75006 Parent Company: ECOLAB INC Industry: Soap and Other Detergent Manufacturing (325611) Chemical: Certain glycol ethers Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N230
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Source Reduction:: S25: Other process modifications made
Source Reduction:: S35: Other improvements to inventory and material management Source Reduction:: S41: Improved scheduling, record keeping, or procedures for operations, cleaning, and maintenance |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T04: Participative team management Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
S25: W68 Improved Equipment Rinse OperationImproving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. S35: W29 Other changes in inventory controlInventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. S41: W14 Changed production schedule to minimize equipment and feedstock change-oversProduction schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Team planners and schedulers help adjust production schedules in an effort to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Infrequent testing of expired materials for possible re-use, in conjunction with more focus on accurate labeling, has helped to reduce the amount of waste generated. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Source Reduction - Timely reporting of expiring materials to vendors periodically results in the ability to return the materials prior to expiration and necessary disposal. Source Reduction - Inventory control personnel help ensure that inventory is accurately tracked and managed in a manner to prevent expiration of raw materials. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Other Environmental Practices: Waste Treatment - The neutralization capabilities of the wastewater treatment system are more efficient due to newer and improved technology, therefore allowing for a reduction in chemistry needed to effectively neutralize wastewater influent to within permit limits prior to discharging to the POTW. Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Good planning, inventory and spill control practices are as effective as possible and keep usage to a minimum. Other Environmental Practices: General Environmental Management - P2 is incorporated into original process design via the use of the company's "Management of Change Process", in which environmental sustainability efforts are addressed. Source Reduction: Source Reduction - (1) Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. (2) Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. (3) Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. Barriers to P2: B7 - No known substitutes or alternative technologies. - There are currently no known suitable raw material replacements for the products manufactured. |
2021 |
Source Reduction:: S25: Other process modifications made
Source Reduction:: S35: Other improvements to inventory and material management Source Reduction:: S41: Improved scheduling, record keeping, or procedures for operations, cleaning, and maintenance |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T04: Participative team management Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
S25: W68 Improved Equipment Rinse Operation: Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. S35: W29 Other changes in inventory control: Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. The Catalyst/SAP system that was implemented in late RY2020 helped with inventory control throughout all of RY2021. S41: W14 Changed production schedule to minimize equipment and feedstock change-oversProduction schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Employee Recommendation: P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Source Reduction - Internal Pollution Prevention Opportunity Audit(s): P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Source Reduction - Participate Team Management: Team planners and schedulers help adjust production schedules in an effort to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Materials Balance Audits: Inventory control personnel help ensure that inventory is accurately tracked and managed in a manner to prevent expiration of raw materials. The Catalyst/SAP system that was implemented in late RY2020 helped with inventory control throughout all of RY2021. Source Reduction - Other: Infrequent testing of expired materials for possible re-use, in conjunction with more focus on accurate labeling, has helped to reduce the amount of waste generated. Source Reduction - Vendor Assistance: Timely reporting of expiring materials to vendors periodically results in the ability to return the materials prior to expiration and necessary disposal. Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Good planning, inventory and spill control practices are as effective as possible and keep usage to a minimum. Barriers to P2: B7 - No known substitutes or alternative technologies. - There are currently no known suitable raw material replacements for the products manufactured. |
2020 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W29: Other changes in inventory control Source Reduction:: W68: Improved rinse equipment operation |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
W14: Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. W29: Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. W68: Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. Source Reduction - Team planners and schedulers help adjust production schedules in an effort to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Infrequent testing of expired materials for possible re-use, in conjunction with more focus on accurate labeling, has helped to reduce the amount of waste generated. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Source Reduction - Timely reporting of expiring materials to vendors periodically results in the ability to return the materials prior to expiration and necessary disposal. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. Source Reduction - Inventory control personnel help ensure that inventory is accurately tracked and managed in a manner to prevent expiration of raw materials. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. Source Reduction - Reducing the consumption of raw materials via good house-keeping and inventory control practices and implementing various process/equipment changes needed for reducing water usage and waste/wastewater generation amounts continue to benefit the site's environmental sustainability efforts. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. Source Reduction: Ways P2 Was Incorporated in Original Process Design - P2 is incorporated into original process design via the use of the company's "Management of Change Process", in which environmental sustainability efforts are addressed. Other Environmental Practices: Waste Treatment - The neutralization capabilities of the wastewater treatment system are more efficient due to newer and improved technology, therefore allowing for a reduction in chemistry needed to effectively neutralize wastewater influent to within permit limits prior to discharging to the POTW. Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Good planning, inventory and spill control practices are as effective as possible and keep usage to a minimum. Source Reduction: Source Reduction - (1) Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. (2) Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. (3) Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. A new Catalyst/SAP system was implemented in RY2020 to help with inventory control. Barriers to P2: B7 - No known substitutes or alternative technologies. - There are currently no known suitable raw material replacements for the products manufactured. Source Reduction: Methods for Identifying Pollution Prevention Opportunities - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing waste, water consumption and wastewater generation rates. |
2019 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W29: Other changes in inventory control Source Reduction:: W68: Improved rinse equipment operation |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
W14: Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. W29: Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. W68: Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. Source Reduction - Team planners and schedulers help adjust production schedules in an effort to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Infrequent testing of expired materials for possible re-use, in conjunction with more focus on accurate labeling, has helped to reduce the amount of waste generated. Source Reduction - Inventory control personnel help ensure that inventory is accurately tracked and managed in a manner to prevent expiration of raw materials. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. Source Reduction - Timely reporting of expiring materials to vendors periodically results in the ability to return the materials prior to expiration and necessary disposal. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. Source Reduction - Reducing the consumption of raw materials via good house-keeping and inventory control practices and implementing various process/equipment changes needed for reducing water usage and waste/wastewater generation amounts continue to benefit the site's environmental sustainability efforts. Source Reduction: Ways P2 Was Incorporated in Original Process Design - P2 is incorporated into original process design via the use of the company's "Management of Change Process", in which environmental sustainability efforts are addressed. Source Reduction: Source Reduction - (1) Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. (2) Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. (3) Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Good planning, inventory and spill control practices are as effective as possible and keep usage to a minimum. Other Environmental Practices: Waste Treatment - The neutralization capabilities of the wastewater treatment unit are more efficient due to newer and improved technology, therefore allowing for a reduction in chemistry needed to effectively neutralize wastewater influent to within permit limits prior to discharging to the POTW. Source Reduction: Methods for Identifying Pollution Prevention Opportunities - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. Barriers to P2: B7 - No known substitutes or alternative technologies. - There are currently no known suitable raw material replacements for the products manufactured. |
2018 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W29: Other changes in inventory control Source Reduction:: W68: Improved rinse equipment operation |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
W14: Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. W29: Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. W68: Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. Source Reduction - Team planners and schedulers help adjust production schedules in an effort to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. Source Reduction - Infrequent testing of expired materials for possible re-use, in conjunction with more focus on accurate labeling, has helped to reduce the amount of waste generated. Source Reduction - Inventory control personnel help ensure that inventory is accurately tracked and managed in a manner to prevent expiration of raw materials. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. Source Reduction - Timely reporting of expiring materials to vendors periodically results in the ability to return the materials prior to expiration and necessary disposal. Source Reduction - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. Source Reduction - Reducing the consumption of raw materials via good house-keeping and inventory control practices and implementing various process/equipment changes needed for reducing water usage and waste/wastewater generation amounts continue to benefit the site's environmental sustainability efforts. Source Reduction: Ways P2 Was Incorporated in Original Process Design - P2 is incorporated into original process design via the use of the company's "Management of Change Process", in which environmental sustainability efforts are addressed. Source Reduction: Source Reduction - (1) Improving rinse equipment operations (e.g. flow rate and time of rinsing) to control the amount of water used to clean equipment after product change-overs continues to help keep waste and wastewater generation rates as low as possible. (2) Production schedules are routinely adjusted to minimize change-overs. This helps minimize wastes generated during raw material transfers and cleaning/rinsing operations associated with change-overs. (3) Inventory control practices used during the reporting year consisted of a variety of the following activities: (a) performing routine inventory checks to ensure that raw materials/chemicals don't expire beyond their shelf-lives, (b) returning raw materials to vendors prior to their expiration, (c) testing outdated materials for possible re-use, and (d) placing more focus on accurate labeling of raw materials and products before, during and after transfer steps. Source Reduction: Methods for Identifying Pollution Prevention Opportunities - P2 opportunities are identified by P2 team members and the corporate environmental sustainability team via internal and external audits and site sharing. All P2 ideas, including necessary resources, equipment and estimated costs, are presented for approval and implemented if found to be feasible. This year's focus was on reducing water consumption and wastewater generation rates. |
2017 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
W21: Improved inventory control practices. Source Reduction - Internal audits and inspections led to pollution prevention (source reduction) activities and actions taken. Source Reduction - Inventory control recommendations were recommended by internal employees and teams. Source Reduction - More efficient washing of equipment after change-overs helped reduce wastewater containing trace quantities of glycol ethers. |
2016 |
Other Environmental Practices: Recycling - currently recycle all wood pallets, plastic and metal totes and drums and any metal items. |
||
2015 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers[-15-24%]
Source Reduction:: W52: Modified equipment, layout, or piping[-25-49%] |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
W14: longer production run times for similar products to reduce changeovers W52: upgrading and installing newer machines and conveyors |