Facility ID: 78343XBSHPUSHWY
Facility Name and Address: OQ CHEMICALS BISHOP LLC 5738 COUNTY ROAD 4 - BISHOP BISHOP, TX 78343 Parent Company: OQ CHEMICALS CORP Industry: All Other Basic Organic Chemical Manufacturing (325199) Chemical: Acetaldehyde Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=000075070
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2020 |
Other Environmental Practices: Waste Treatment - Installed additional sampler on waste stream that is going to WWTP |
||
2019 |
Source Reduction:: W64: Improved draining procedures[-5-14%]
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T11: Other |
W64: Installed enclosed sampling systems to reduce the need to rinse sample bottles Source Reduction - Will monitor progress Source Reduction - Material balance will be used for claculations of waste through out the year of 2020 Other Environmental Practices: Waste Treatment - will keep installing more enclosed samplers to reduce effluent |
2018 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas |
W52: Installed sampling systems that will reduce the amount of material going to wastewater treatment facility. The process stream circulates continually so no flushing the sample line before collecting the sample for analysis. Source Reduction - Identified on our P2 plan update Other Environmental Practices: Waste Treatment - Installed sampling systems that will reduce the amount of material going to wastewater treatment facility Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Installed sampling systems that will reduce the amount of material going to wastewater treatment facility |