Related Topics:
Facility ID: 80301HSRCH5555A
Facility Name and Address: AGILENT TECHNOLOGIES BOULDER CO 5555 AIRPORT BLVD BOULDER, CO 80301 Parent Company: AGILENT TECHNOLOGIES INC Industry: Pharmaceutical Preparation Manufacturing (325412) Chemical: Dichloromethane Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0000075092
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2018 |
Other Barriers to Source Reduction - The use of DCM is dependent on the product being produced per client specifications. |
||
2016 |
Source Reduction:: W52: Modified equipment, layout, or piping[-0-4%]
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T04: Participative team management |
W52: Replaced 5,300 gallon bulk hazardous waste storage tank with a new, 14,000 gallon tank. The gasket/seal at the rupture disk on the emergency vent system of the old tank was sometimes leaking after a waste offload. The leak rate was monitored after waste offloads, and the rupture disk was being replaced, as needed. The new hazardous waste bulk storage tank has resulted in a reduction of fugitive emissions. Other Environmental Practices: General Environmental Management - Waste system components and bulk hazardous waste tank are monitored monthly for leaks using a flame ionization detector (FID). Chemical/process system components and bulk ACN tank are monitored quarterly for leaks using the FID. Incident investigations are conducted for all spills/releases involving chemicals to decrease the potential for a reoccurrence. Inspections of the bulk hazardous waste system and bulk ACN system are conducted daily. RCRA satellite accumulation areas and 90-day accumulation areas are inspected weekly. Identified leaks are repaired. Other Environmental Practices: Energy Recovery - Bulk organic hazardous waste, solid hazardous waste, and drummed organic waste is sent off-site for energy recovery. |
1996 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W61: Changed to aqueous cleaners (from solvents or other materials) |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
|
1995 |
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
1994 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W61: Changed to aqueous cleaners (from solvents or other materials) |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
1993 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations Source Reduction:: W51: Instituted recirculation within a process |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |
|
1992 |
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Source Reduction:: W35: Installed vapor recovery systems Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W51: Instituted recirculation within a process |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T04: Participative team management |