Related Topics:
Facility ID: 95678NCLCT7501F
Facility Name and Address: TSI SEMICONDUCTORS AMERICA LLC 7501 FOOTHILLS BLVD ROSEVILLE, CA 95747 Parent Company: TSI SEMICONDUCTORS LLC Industry: Semiconductor and Related Device Manufacturing (334413) Chemical: Hydrogen fluoride Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007664393
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2020 |
Barriers: B1-Barriers to P2 B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat
|
Barriers to P2: B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat - TSI Semiconductors Roseville experienced a slow down in production during 2020 (COVID-19 related). TSI did not have capital available to invest in pollution prevention changes. |
|
2019 |
Source Reduction:: W52: Modified equipment, layout, or piping[-25-49%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible |
Barriers to P2: B8 - A reduction does not appear to be technically feasible - Modified piping to enable use of bulk feed system, reducing the use of smaller containers. Extended chemical change timer to use each batch of chemical for a longer period of time. |
2018 |
Source Reduction:: W52: Modified equipment, layout, or piping[-25-49%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
W52: Modified piping to enable use of bulk feed system, reducing the use of smaller containers. Extended chemical change timer to use each batch of chemical for a longer period of time. |
2017 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis
|
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
|
|
2016 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis
|
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
|
W50: Increased chemical recirculation prior to draining to waste. Source Reduction - Employee recommendation as part of cost reduction team activity. |
2015 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis[-25-49%]
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
|
|
2014 |
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
W55: Plumbing was added to use bulk containers rather than 5 gallon carboys that always were sent back with approx. 3%. |
1991 |
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
|
Methods to Identify SR Opportunities: T11: Other
|