Related Topics:
Facility ID: 99216CMNCLEAST1
Facility Name and Address: HONEYWELL ELECTRONIC MATERIALS INC 15128 E. EUCLID AVE SPOKANE VALLEY, WA 99216 Parent Company: HONEYWELL INTERNATIONAL INC Industry: All Other Miscellaneous Fabricated Metal Product Manufacturing (332999) Chemical: Copper compounds Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=N100
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2019 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Other Environmental Practices: Recycling - The site is continually examining its processes to identify where waste material may be further collected to be sent out for recycling. Various machining processes are being examined to provide for adequate separation/segregation of materials to allow for further recycling possibilities. Barriers to P2: B7 - No known substitutes or alternative technologies. - Product being manufactured makes use of copper as a primary component. As such no substitution of material could be identified to support an elimination or use of alternative technology for the process. |
|
2018 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
Barriers to P2: B7 - No known substitutes or alternative technologies. - The site manufactures specific products that use the subject chemical. No source reduction measures can be identified at this time that could be used as substitute material or alternative technology. Barriers to P2: B8 - A reduction does not appear to be technically feasible - A reduction of copper use would have a direct and negative impact onto site production. |
|
2017 |
Other Environmental Practices: Recycling - In lieu of disposing of this material the site is working with a business that re-integrates the material into its processes for re-use in industry. |
||
2016 |
Other Environmental Practices: Recycling - The site was able to identify a business that can re-use the copper compound being generated from site processes. The site has effectively reduced impact of disposal for copper sulfate by sending it for re-use instead of hazardous waste disposal. |
||
2015 |
Other Environmental Practices: Recycling - The site intends on achieving a significant reduction in the quantities that it is currently sending offsite for landfill disposal. The site is working on a program through which the copper compounds would be sold in industry for further use, instead of disposal. The program is anticipated to take place in 2016. |
||
2013 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
W49: The use of reclamation is being applied to aid in the reduction of copper compounds waste. Source Reduction - The facility conducts biannual inventory counts. These are physical inventory counts that allow for a better examination of the material and identification of potential source reduction through process improvements. Other Environmental Practices - Values for material recycled onsite and those for material recycled offsite are reflective of the reclamation process in place at the site. |
2012 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2011 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2010 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2009 |
Source Reduction:: W49: Other raw material modifications
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2008 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
2007 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
2006 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
|
2005 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|