Related Topics:
|
Facility ID: 6011WNFDWR338WU
Facility Name and Address: UNIFIED WIRE & CABLE INC. 338 WURLITZER DRIVE DEKALB, IL 60115 Parent Company: Industry: Copper Rolling, Drawing, Extruding, and Alloying (331420) Chemical: Copper Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=0007440508
| Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Pollution Prevention Activities for Selected Chemical
| Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
|---|---|---|---|
| 2024 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - UWC purchases 8mm Cu Rod and draw it down to the sizes needed. |
|
| 2023 |
Source Reduction:: S24: Modified or updated equipment or layout[-25-49%]
|
Methods to Identify SR Opportunities: T11: Other
|
S24: Put in two more multi-draw machines to add in output. Source Reduction - Able to use more Rod Mill throughput with the addition of the 2 multi-wire machines |
| 2022 |
Source Reduction:: S21: Optimized process conditions to increase efficiency[-0-4%]
Source Reduction:: S24: Modified or updated equipment or layout[-0-4%] |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T10: Vendor assistance |
S21: Introduced new machinery and modified plant layout to increase efficiency and minimize scrap. S24: Introduced new machinery and modified plant layout to increase efficiency and minimize scrap. Source Reduction - Outside contractors helped move new/existing equipment, and repaired machinery. Source Reduction - Provided scope of work, held bi-weekly meetings, provided guidance to the outside contractors. Source Reduction - Outside contractors introduced new PLC and control programming to some of our machines. |
| 2021 |
Source Reduction:: S35: Other improvements to inventory and material management[-5-14%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
S35: Implemented an ERP system to help with scheduling to increase efficiency while avoiding costly turnovers in-terms of the amount of scrap produced. It also helped allocate extra material for other orders that would have otherwise been scrapped. Source Reduction - Implemented an ERP system to help with scheduling to increase efficiency while avoiding costly turnovers in-terms of the amount of scrap produced. It also helped allocate extra material for other orders that would have otherwise been scrapped. |
| 2014 |
Other Environmental Practices: Recycling - We Recycle 100% of all copper. |

