Related Topics:
Facility ID: 03062TRDYN4PITT
Facility Name and Address: AMPHENOL APC INC 91 NORTHEASTERN BLVD NASHUA, NH 03062 Parent Company: AMPHENOL CORP Industry: Bare Printed Circuit Board Manufacturing (334412) Chemical: Formaldehyde Reports: View TRI Facility profile report for this facility View TRI Form R submissions by this facility |
|
*You can navigate within the map with your mouse. |
Production Related Waste Management for Selected Chemical
lchemid=000050000
Chart Options1: |
Waste Management Comparison -
Display facility comparison report for this industry and chemical
Display facility comparison report for this parent company
Pollution Prevention Activities for Selected Chemical
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Source Reduction:: S21: Optimized process conditions to increase efficiency[-0-4%]
Source Reduction:: S03: Substituted raw materials, feedstock, or reactant chemical[-0-4%] |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction. |
S03: Evaluate potential to replace Formaldehyde based electroless copper S21: Ensure sensors and dosing pumps are properly calibrated. Source Reduction - Process engineer working to optimize system Source Reduction - Process engineers to research and evaluate the potential to replace existing process chemistry with an alternative process Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - All process changes require customer approval, engineering concerned with potential effect on product quality |
2021 |
Source Reduction:: S43: Introduced in-line product quality monitoring or other process analysis system
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction. |
S43: Updated online analytical/dosing equipment Source Reduction - Process engineering Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - While concerns exist in replacing process we are currently working to replace existing process and potential source replacement. |
2020 |
Source Reduction:: W58: Other process modifications[-0-4%]
|
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T11: Other Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas Barriers: B4-Barriers to P2 B4 - Source reduction activities were implemented but were unsuccessful. |
W58: Improved frequency of testing chemical bath to avoid bath failures Source Reduction - Utilize point source reduction which destroys the compound Source Reduction - Utilized recommendations from vendor to improve process control Barriers to P2: B4 - Source reduction activities were implemented but were unsuccessful. - Issues with the bath resulted in additional usage of chemical Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - Utilizing current accepted point source reduction process. |
2019 |
Source Reduction:: W58: Other process modifications
|
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
|
W58: Optimized the process control module, this analyzes the bath conditions and meters in the chemistry needed to maintain proper conditions Source Reduction - Process engineer oversees the process operation |
2018 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
W13: Reduction in PM schedule results in a reduction of material that goes to treatment (loss due to tank clean out) Source Reduction - Working with engineer to extend time between Preventative Maintenance cycles to reduces losses due to activities |
2017 |
Barriers: B6-Barriers to P2 B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas
|
Barriers to P2: B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas - A point source reduction unit is utilized but still results in some transfer |
|
2016 |
Source Reduction:: W19: Other changes in operating practices[-50-99%]
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
|
W19: Utilize a point source treatment module, Formaldehyde is destroyed during the plate cycle. Point source forces plate out of the spent electroless there by reducing Formaldehyde transfer |
2015 |
Barriers: B1-Barriers to P2 B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat
|
Barriers to P2: B1 - Insufficient capital to install new source reduction equipment or implement new source reduction activities/initiat - Down turn in business reduces available capital for activities. |
|
2014 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Electroless copper must be maintained in balance of its components. |
|
2010 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other |
|
2009 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T11: Other |