Facility ID: 9402WCSBCX2KELL
Facility Name and Address: CSBIO 20 KELLY CT MENLO PARK, CA 94025 Parent Company: CSBIO Industry: Pharmaceutical Preparation Manufacturing (325412) Chemical: Acetonitrile |
|
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2021 |
Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies.
|
Barriers to P2: B7 - No known substitutes or alternative technologies. - No known substitute or alternative for solvent used in peptide synthesis processes at this time. |
|
2020 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Materials must meet GMP standards and are an approved process |
|
2019 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Materials must meet GMPstandards and are an approved process |
|
2018 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
|
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Materials must meet GMP standards and are an approved process |
|
2017 |
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
Barriers: B7-No Information B7 - No known substitutes or alternative technologies. |
Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Materials must meet GMP standards and approved processes |
|
2015 |
Source Reduction:: W19: Other changes in operating practices[-5-14%]
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond[-5-14%] |
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) |
W19: Increased training focused on minimizing use of raw materials |
The Waste Management Hierarchy |
The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes.
The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed
by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
|