TRI Pollution Prevention Report for SACHEM INC and Acetonitrile

Facility ID: 76031SCHMN2311P

Facility Name and Address:
SACHEM INC
2311 PIPELINE RD
CLEBURNE, TX 76033

Parent Company: SACHEM INC

Industry: All Other Basic Organic Chemical Manufacturing (325199)
Chemical: Acetonitrile

Production Related Waste Management for Selected Chemical


lchemid=0000075058
    Waste Management Comparison - 2017



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2022 Source Reduction:: S25: Other process modifications made

Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.

Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Product quality was not the same. Looking at other options.

2021 Source Reduction:: S25: Other process modifications made

Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
S25: Modifications made to process to use less raw material.

Source Reduction - As part of sustainability team, efforts made based on Technology Chemist.
Source Reduction - Operating Equipment Efficiency team formed by management to increase process efficiency site wide.
2020 Source Reduction:: W29: Other changes in inventory control[-0-4%]
Methods to Identify SR Opportunities: T11: Other
W29: Reuse of product prior to using new product.

2018 Source Reduction:: W29: Other changes in inventory control[-0-4%]
Methods to Identify SR Opportunities: T11: Other
2017 Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T11: Other
W29: Reused "old" solvent prior to use of new solvent; better management of inventory

Source Reduction - better tracking of inventory recommendation
2016 Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
W50: Worked with process chemists to aide in optimizing process for greater use of solvent


Other Environmental Practices: Recycling - Reuse of solvent within process several times before discarding

2015 Source Reduction:: W29: Other changes in inventory control

Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Source Reduction - Waste reduction goal/pollution prevention goal for site
Source Reduction - Waste reduction team developed to help achieve goal

Other Environmental Practices: Source Reduction - Reusing material from process several times before discarding. This allowed us to use less raw material. As well as modifying process to be able to reuse ACN.

2014 Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis[-5-14%]

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2013 Source Reduction:: W51: Instituted recirculation within a process
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
W51: Reuse material within process before using virgin material for production.

2012 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2011 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2010 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2009 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2008 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2007 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2006 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
2005 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
2004 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
2003 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
2002 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
2001 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
1997 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
1996 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
1994 Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.