TRI Pollution Prevention Report for SOLENIS LLC and Acrylic acid

Facility ID: 23434LLDCL2301W

Facility Name and Address:
SOLENIS LLC
2301 WILROY RD
SUFFOLK, VA 23434

Parent Company: PLATINUM EQUITY ADVISORS LLC

Industry: All Other Basic Organic Chemical Manufacturing (325199)
Chemical: Acrylic acid

Production Related Waste Management for Selected Chemical


lchemid=0000079107
    Waste Management Comparison - 2017



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2019 Source Reduction:: W29: Other changes in inventory control
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
W29: Reduced the number of storage tanks in acrylic acid operation resulting in reduced air emissions.
W33: Installed additional alarms and interlocks on wastewater pretreatment plant to better control volume of low pH water and reduce discharge to POTW.

Source Reduction - Identified as an opportunity during a team investigation into low pH incident at the site's wastewater pretreatment plant.
2018 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
2017 Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Methods to Identify SR Opportunities: T04: Participative team management
2016 Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2013 Source Reduction:: W39: Other spill or leak prevention
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Source Reduction - In 2013 the site implemented a site wide spill prevention plan . The plan was composed of spill teams which focused their attention on over-fill protections and safe chemical transfer.
2012 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2011 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Source Reduction - Extended drainage lines from process tanks into floor drains. Vessel wash water can be sent to waste water treatment instead of isolating it as solid waste.
2010 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2008 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T11: Other
2007 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
2006 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2005 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
2004 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W39: Other spill or leak prevention
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2003 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W39: Other spill or leak prevention
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
2002 Source Reduction:: W39: Other spill or leak prevention
Source Reduction:: W51: Instituted recirculation within a process
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2001 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2000 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
1999 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
1994 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
1993 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
1992 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W24: Instituted better labeling procedures
Source Reduction:: W63: Modified containment procedures for cleaning units
Source Reduction:: W66: Modified or installed rinse systems
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1991 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W24: Instituted better labeling procedures
Source Reduction:: W63: Modified containment procedures for cleaning units
Source Reduction:: W66: Modified or installed rinse systems
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.