Facility ID: 34294PRDYN8550U
Facility Name and Address: DASAN ZHONE SOLUTIONS INC 8545 126TH AVE N LARGO, FL 33773 Parent Company: DASAN ZHONE SOLUTIONS INC Industry: Printed Circuit Assembly (Electronic Assembly) Manufacturing (334418) Chemical: Lead |
|
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2016 |
Source Reduction:: W42: Substituted raw materials[-25-49%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) |
W42: Production is moving toward non-lead solder processes; however the repairs to old product still require maintaining a lead-solder process. Source Reduction: Source Reduction - Manufacturing processes for new products built will be designed with lead-free components. |
2015 |
Source Reduction:: W42: Substituted raw materials[-15-24%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
Source Reduction: Source Reduction - Current efforts underway to replace Lead in manufacturing process with Lead-Free substituted chemicals. |
2014 |
Source Reduction:: W42: Substituted raw materials[-15-24%]
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W42: Production is phasing out lead solder in manufacturing process and replacing raw component to a lead-free solder |
2013 |
Source Reduction:: W42: Substituted raw materials
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W42: Production is phasing Lead-Free Wave Solder into use for new boards built. |
2012 |
Source Reduction:: W42: Substituted raw materials
|
Methods to Identify SR Opportunities: T04: Participative team management
|
W42: Production is newly implementing a Tin-Based Wave Solder Production Line to phase out the Lead/Tin Wave Solder Application and Reduce Overall Lead-based components in Manufacturing. |
2001 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W58: Other process modifications |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) |
The Waste Management Hierarchy |
The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes.
The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed
by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
|