TRI Pollution Prevention Report for SHERWIN-WILLIAMS CO and Chromium compounds (except for chromite ore mined in the Transvaal Region)

Facility ID: 60901THVLS901NO

Facility Name and Address:
SHERWIN-WILLIAMS CO
901 N GREENWOOD AVE
KANKAKEE, IL 60901

Parent Company: THE SHERWIN-WILLIAMS CO

Industry: Paint and Coating Manufacturing (325510)
Chemical: Chromium compounds (except for chromite ore mined in the Transvaal Region)

Production Related Waste Management for Selected Chemical


lchemid=N090
    Waste Management Comparison - 2015



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2015 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations


Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2013 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2012 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2011 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2010 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2009 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2008 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2007 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
2006 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
2005 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
2004 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Source Reduction:: W42: Substituted raw materials
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves

Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
1997 Source Reduction:: W52: Modified equipment, layout, or piping

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W52: Modified equipment, layout, or piping

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1995 Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
1994 Source Reduction:: W42: Substituted raw materials

Source Reduction:: W51: Instituted recirculation within a process

Source Reduction:: W52: Modified equipment, layout, or piping

Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
1993 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W52: Modified equipment, layout, or piping

Source Reduction:: W59: Modified stripping/cleaning equipment

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
1992 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Source Reduction:: W52: Modified equipment, layout, or piping

Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
1991 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W41: Increased purity or raw materials

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.