TRI Pollution Prevention Report for SHERWIN-WILLIAMS CO and Certain glycol ethers

Facility ID: 61108THVLS200SA

Facility Name and Address:
SHERWIN-WILLIAMS CO
1215 NELSON BLVD
ROCKFORD, IL 61104

Parent Company: THE SHERWIN-WILLIAMS CO

Industry: Paint and Coating Manufacturing (325510)
Chemical: Certain glycol ethers

Production Related Waste Management for Selected Chemical


lchemid=N230
    Waste Management Comparison - 2014



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2016 Source Reduction:: W31: Improved storage or stacking procedures
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
2015 Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves
Methods to Identify SR Opportunities: T04: Participative team management
2014 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2013 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2009 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W52: Modified equipment, layout, or piping

Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2003 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W41: Increased purity or raw materials

Source Reduction:: W52: Modified equipment, layout, or piping


Source Reduction:: W82: Modified design or composition of product

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
2002 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W41: Increased purity or raw materials

Source Reduction:: W52: Modified equipment, layout, or piping


Source Reduction:: W82: Modified design or composition of product

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
1997 Source Reduction:: W19: Other changes in operating practices

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
1996 Source Reduction:: W19: Other changes in operating practices

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
1995 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1994 Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Source Reduction:: W41: Increased purity or raw materials
Source Reduction:: W52: Modified equipment, layout, or piping

Source Reduction:: W59: Modified stripping/cleaning equipment
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
1993 Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde
Source Reduction:: W41: Increased purity or raw materials
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
1992 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W24: Instituted better labeling procedures
Source Reduction:: W31: Improved storage or stacking procedures
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1991 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W41: Increased purity or raw materials

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.