TRI Pollution Prevention Report for NATIONAL COATINGS INC and Certain glycol ethers

Facility ID: 61401NTNLCRTE15

Facility Name and Address:
NATIONAL COATINGS INC
604 US HWY 150 E
GALESBURG, IL 61401

Parent Company:

Industry: Paint and Coating Manufacturing (325510)
Chemical: Certain glycol ethers

Production Related Waste Management for Selected Chemical


lchemid=N230
    Waste Management Comparison - 2015



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2015 Barriers: B6-No Information B6 - Pollution prevention previously implemented - additional reduction does not appear technically or economically feas

Other Environmental Practices: Energy Recovery - Changed waste facilities, no known energy recovery

Other Environmental Practices: Waste Treatment - Actual quarterly waste analysis used to determine the amount of waste transferred off-site. This is the first year of using actual analysis instead of a percentage of product usage.

2012 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves

Source Reduction:: W42: Substituted raw materials

Source Reduction:: W52: Modified equipment, layout, or piping

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
2010 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2009 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
2008 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W23: Eliminated shelf-life requirements for stable materials

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
2007 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W42: Substituted raw materials

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W42: Substituted raw materials

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W42: Substituted raw materials
Source Reduction:: W42: Substituted raw materials

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1997 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1995 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W19: Other changes in operating practices

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
1994 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W31: Improved storage or stacking procedures
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1993 Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
1992 Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
1991 Source Reduction:: W25: Instituted clearinghouse to exchange materials that would otherwise be discarde
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources

Source Reduction:: W49: Other raw material modifications
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T04: Participative team management
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.