TRI Pollution Prevention Report for AKZO NOBEL COATINGS INC and Certain glycol ethers

Facility ID: 97302RLNCN1660C

Facility Name and Address:
AKZO NOBEL COATINGS INC
1660 CROSS ST SE
SALEM, OR 97302

Parent Company: AKZO NOBEL NV

Industry: Paint and Coating Manufacturing (325510)
Chemical: Certain glycol ethers

Production Related Waste Management for Selected Chemical


lchemid=N230
    Waste Management Comparison - 2019



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2019 Source Reduction:: W71: Other cleaning and degreasing modifications
Methods to Identify SR Opportunities: T04: Participative team management
W71: Improved manual solvent wash operations by monitoring solvent use during the cleaning operations. Resulted in the reduction of solvent usage by 2600 gallons vs. 2018.

Source Reduction - Objectives and Targets were created at the team level and monitored weekly to achieve goals.
2018 Source Reduction:: W71: Other cleaning and degreasing modifications

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
W71: Improved manual solvent wash operations by monitoring solvent use during the cleaning operations. Resulted in the reduction of solvent usage by 7,000 gallons vs. 2017.

Source Reduction - Internal recognition of material usage, pollution prevention and cost reduction.
Source Reduction - Objective and Targets were created at the team level and monitored weekly to achieve goals.

Source Reduction: Source Reduction - Extensive efforts were achieved in reducing the usage of manual solvent wash activities resulting in source reduction.

2013 Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T11: Other
W58: Continue to utilize former wastes in product mix.

Source Reduction - Continue to improve reclaim process.
2012 Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T11: Other
W58: Utilized former wastes in product mix.

Source Reduction - Improved reclaim processes.
2011 Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T11: Other
W58: Utilized in former wastes in product mix.

Source Reduction - Improved reclaim processes for dirty wash solvents.
2008 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2007 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2006 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2005 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W22: Began to test outdated material - continue to use if still effective
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
2004 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2003 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2002 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2001 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W29: Other changes in inventory control
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations


Source Reduction:: W35: Installed vapor recovery systems


Source Reduction:: W55: Changed from small volume containers to bulk containers to minimize discarding


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management
1995 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers


Source Reduction:: W42: Substituted raw materials


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T10: Vendor assistance
1994 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Source Reduction:: W31: Improved storage or stacking procedures


Source Reduction:: W42: Substituted raw materials


Source Reduction:: W51: Instituted recirculation within a process


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
1993 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Source Reduction:: W31: Improved storage or stacking procedures


Source Reduction:: W42: Substituted raw materials


Source Reduction:: W51: Instituted recirculation within a process


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
1992 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Source Reduction:: W31: Improved storage or stacking procedures


Source Reduction:: W42: Substituted raw materials


Source Reduction:: W51: Instituted recirculation within a process


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
1991 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Source Reduction:: W31: Improved storage or stacking procedures


Source Reduction:: W42: Substituted raw materials


Source Reduction:: W51: Instituted recirculation within a process


Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.