TRI Pollution Prevention Report for AMPHENOL APC INC and Copper compounds

Facility ID: 03062TRDYN4PITT

Facility Name and Address:
AMPHENOL APC INC
91 NORTHEASTERN BLVD
NASHUA, NH 03062

Parent Company: AMPHENOL CORP

Industry: Bare Printed Circuit Board Manufacturing (334412)
Chemical: Copper compounds

Production Related Waste Management for Selected Chemical


lchemid=N100
    Waste Management Comparison - 2014



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2022 Source Reduction:: S06: Other material modifications made[-0-4%]
Methods to Identify SR Opportunities: T04: Participative team management
Barriers: B3-Barriers to P2 B3 - Concern that product quality may decline as a result of source reduction.
S06: Evaluating the potential to use non-sacrificial anodes in Copper electroplating process. Reduction in copper anodes could reduce the amount of Copper build up in the baths. Elevated Copper results in the need to decant the bath to lower copper concentration. The decanted solution then oes to waste generating F006 Sludge.

Source Reduction - Engineering group working to evaluate the use of non-sacrificial anodes.

Barriers to P2: B3 - Concern that product quality may decline as a result of source reduction. - Alteration of bath control could potentially have a negative effect on Products.

2021 Source Reduction:: S21: Optimized process conditions to increase efficiency[-0-4%]

Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
S21: Utilize automated controls based on key parameters of process.

Source Reduction - Engineer working to optimize process to avoid scrap events from process out of spec events

Barriers to P2: B8 - A reduction does not appear to be technically feasible - Material usage is based on customer designs and demand. Amphenol Printed Circuits produces product specific to customer creating a wide variation in production demands.

2020 Source Reduction:: W58: Other process modifications[-0-4%]
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
W58: Changed plating bath type, which should not generate as much excess copper sulfate

Source Reduction - Engineer designed new plating bath which should not generate as much excess copper
2019 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures[-0-4%]

Source Reduction:: W19: Other changes in operating practices[-5-14%]
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
W13: Established dump/decant criteria to extend useful bath life, there by reducing waste generated from extra dumps and decants.
W19: Based upon plating requirements some copper plating baths were taken off line due to the fact their plating characteristics no longer were needed in the products being manufactured. This resulted in a reduction in Copper as Copper compounds.

Source Reduction - Decommisioned baths that no longer suited production needs.
Source Reduction - Process engineers worked with vendors to ensure the baths were not going to produce scrap due to bath life extension.
Source Reduction - Process engineers worked to create criteria to extend bath life.
2018 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
W13: Worked with process engineers to reduce dump and remake of chemical baths to extend the useful life of chemistry

Source Reduction - Worked with process engineers to reduce dump and remake of chemical baths to extend the useful life of chemistry
2017 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
W13: Worked with engineers to extend bath lives to reduce dump/remake

Source Reduction - Evaluated rate of contaminant buildup as well as evaluating effects on quality of product.
2016 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures[-0-4%]
Source Reduction:: W22: Began to test outdated material - continue to use if still effective[-0-4%]

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance
W13: Extend bath life by determining more accurate dump triggers. (Continuous)
W22: Materials that expired are used if it can be recertified

Source Reduction - Work with process engineers to extend bath life
2015 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
W14: While not a true reduction, based on production levels some process tanks were taken down, therefore reducing the chemical demand of maintaining the baths

2014 Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond[-0-4%]
Source Reduction:: W22: Began to test outdated material - continue to use if still effective[-0-4%]
Source Reduction:: W58: Other process modifications[-0-4%]

Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T10: Vendor assistance

Source Reduction: Source Reduction - Reduction of on hand chemicals aided in avoiding material expiration contributing to waste. Continue to tighten operational controls and extend chemical usage life to reduce generation of waste.

2013 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond


Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance
Source Reduction - Ensure we utilize FIFO approach
Other Environmental Practices - We continue to make efforts on source reduction and control. Contiue to "fine tune" approach.
2012 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers

Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond


Source Reduction:: W22: Began to test outdated material - continue to use if still effective

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T10: Vendor assistance
W14: Altered procedures to avoid time based change over, converted to production values, contaminate levels and product quality
W21: Ensured first in first out inventory management also reduced on hand quantities to reduce potential for expired material
W22: In cases where a material exceeds expiration date instituted evaluation.

2010 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T11: Other
2009 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures


Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program)
Methods to Identify SR Opportunities: T11: Other
Source Reduction - Amphenol evaluated chemical preventative maintenance schedule and found the PM schedule did not change based on production levels. Engineers were tasked at determining updated scheduling based on production throughput. Any deviation from the new schedule required Management approval. Also 2009 production was 27 percent lower than previous year.
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.