TRI Pollution Prevention Report for BELDEN WIRE & CABLE and Lead compounds

Facility ID: 42633BLDNWWESTH

Facility Name and Address:
BELDEN WIRE & CABLE
1200 W COLUMBIA AVE
MONTICELLO, KY 42633

Parent Company: BELDEN INC

Industry: Noncurrent-Carrying Wiring Device Manufacturing (335932)
Chemical: Lead compounds

Production Related Waste Management for Selected Chemical


lchemid=N420
    Waste Management Comparison - 2019



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2011 Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W51: Instituted recirculation within a process

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
W51: Regrind compound and reuse in process

2010 Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W42: Substituted raw materials

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T11: Other
2009 Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W42: Substituted raw materials

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance
Methods to Identify SR Opportunities: T11: Other
2008 Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T04: Participative team management
2006 Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program)
2005 Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T04: Participative team management
2004 Source Reduction:: W19: Other changes in operating practices
Methods to Identify SR Opportunities: T04: Participative team management
2003 Source Reduction:: W42: Substituted raw materials
Methods to Identify SR Opportunities: T04: Participative team management
2001 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1997 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T04: Participative team management
1993 Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W42: Substituted raw materials
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T11: Other
1991 Source Reduction:: W19: Other changes in operating practices
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.