Facility ID: 48192SHSTV18655
Facility Name and Address: ASH STEVENS 18655 KRAUSE ST RIVERVIEW, MI 48193 Parent Company: PEL PHARMA INC Industry: Pharmaceutical Preparation Manufacturing (325412) Chemical: Toluene |
|
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Other Environmental Practices: Recycling - Facility does not have enough space for recycling. Source Reduction: Source Reduction - Process is designed to use the least possible amount of material. |
||
2021 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Barriers to P2: B8 - A reduction does not appear to be technically feasible - The process is designed to use the minimum amount of material possible. |
|
2020 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Source Reduction: Ways P2 Was Incorporated in Original Process Design - The process is designed to use the minimal amount of material Barriers to P2: B8 - A reduction does not appear to be technically feasible - The process is designed to use the minimum amount of material possible |
|
2019 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Source Reduction: Ways P2 Was Incorporated in Original Process Design - Process is designed to use the minimum amount of material possible. Barriers to P2: B8 - A reduction does not appear to be technically feasible - Process is designed to minimize material use. |
|
2018 |
Barriers: B8-Barriers to P2 B8 - A reduction does not appear to be technically feasible
|
Source Reduction: Ways P2 Was Incorporated in Original Process Design - Process is designed to use the minimum amount of material possible. Barriers to P2: B8 - A reduction does not appear to be technically feasible - Process is designed to minimize material use. |
|
2013 |
Source Reduction:: W50: Optimized reaction conditions or otherwise increased efficiency of synthesis
|
Methods to Identify SR Opportunities: T04: Participative team management
|
The Waste Management Hierarchy |
The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes.
The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed
by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
|