TRI Pollution Prevention Report for PVS TECHNOLOGIES INC and Chlorine

Facility ID: 48213PVSTC6500F

Facility Name and Address:
PVS TECHNOLOGIES INC
10825 HARPER AVE
DETROIT, MI 48213

Parent Company: PVS CHEMICALS INC

Industry: Other Basic Inorganic Chemical Manufacturing (325180)
Chemical: Chlorine

Production Related Waste Management for Selected Chemical


lchemid=0007782505
    Waste Management Comparison - 2014



Pollution Prevention Activities for Selected Chemical


Reporting Year Section 8.10: Newly Implemented Source Reduction Activity Section 8.10: Methods to Identify Activity Section 8.11: Optional Pollution Prevention Information*
2021
Source Reduction: Source Reduction - Upgrading plant chlorine sensors. Use management of change for changes in production process using chlorine. Use CMMS system to schedule and track activities related to chlorine. JSA"S job safety analysis along with life critical permits are used on all maintenance activities.

2020 Source Reduction - Changed packing material in fume scrubber to improve fume scrubber efficiency, Use of Management of Change for all process changes in production process using chlorine, Use CMMS to track maintenance activities related to chlorine. Use JSA's Job Safety Analysis for all maintenance activities related to Chlorine.
2019 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
W52: modified fume scrubber to increase efficiency

Source Reduction - use management of change process
2018 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
W52: Modified fume scrubber to improve efficiency

Source Reduction - Used management of change process
2017 Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
W52: Modified fume scrubber to improve efficiency

Source Reduction - Used Management of Change Process
2016 Source Reduction:: W52: Modified equipment, layout, or piping[-50-99%]

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
W52: Modified fume scrubber to improve efficiency.

Source Reduction - Use Management of Change Process.
2014 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T11: Other
2013 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T11: Other
W36: chlorine sensors monitor for chlorine leaks

2012 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T11: Other
2011 Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Methods to Identify SR Opportunities: T11: Other
Source Reduction - Perform safety audits on chlorine system. Added additional ambient chlorine monitoring sensors. Raise wind sox. added new motion detection cable for auto shutoff system.
2008 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2007 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management
2006 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T11: Other
Methods to Identify SR Opportunities: T04: Participative team management
2005 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Methods to Identify SR Opportunities: T04: Participative team management
2004 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W42: Substituted raw materials
Source Reduction:: W52: Modified equipment, layout, or piping
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2003 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2002 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W52: Modified equipment, layout, or piping
Source Reduction:: W58: Other process modifications
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T03: Materials balance audits
2001 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations
Source Reduction:: W39: Other spill or leak prevention
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
2000 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1999 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1998 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1997 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1996 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1995 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1994 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T04: Participative team management
1993 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
1992 Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures

Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
*Classifications of Optional Pollution Prevention Information shown in brackets are provided by EPA.


TRI Pollution Prevention Glossary

The Waste Management Hierarchy

The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes. The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
  • Source Reduction includes activities that eliminate or reduce the generation of chemical waste.
  • Recycling includes the recovery of a toxic chemical in waste for reuse.
  • Energy Recovery includes the combustion of toxic chemicals in waste to generate heat or electricity.
  • Treatment includes the destruction of a toxic chemical in waste.
  • Disposal or Other Releases includes toxic chemical quantities entering the environment.
The PPA requires facilities to provide the following details about each chemical they report to TRI:
Facilities may also provide optional Pollution Prevention Information describing their source reduction, recycling, or pollution control activities.