Facility ID: 48220GGPRD625WA
Facility Name and Address: GAGE PRODUCTS CO 625 WANDA AVE FERNDALE, MI 48220 Parent Company: Industry: Paint and Coating Manufacturing (325510) Chemical: Methanol |
|
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2022 |
Other Environmental Practices: General Environmental Management - The Facility has certified ISO 14001 Environmental Management System with ongoing waste reduction environmental programs. |
||
2021 |
Other Environmental Practices: General Environmental Management - The Facility has certified ISO 14001 Environmental Management System with ongoing waste reduction environmental programs. In addition, the facility has begun a process where it adds some of the still bottoms material to select incoming loads, to optimize additional material recovery |
||
2020 |
Other Environmental Practices: General Environmental Management - Company has an ISO14001 Environmental Management System with ongoing waste reduction environmental management programs. |
||
2019 |
Other Environmental Practices: General Environmental Management - Have ISO14001 EMS in place |
||
2014 |
Source Reduction:: W15: Introduced an in-line product quality monitoring or other process analysis system[-0-4%]
|
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management |
W15: Installed a device to more accurately monitor the physical state of the solids concentrating at the base of the new thin film evaporator to reduce crosslinking. As a result, there was a reduction in unpumpable solid waste. |
2012 |
Source Reduction:: W51: Instituted recirculation within a process
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2011 |
Source Reduction:: W82: Modified design or composition of product
|
Methods to Identify SR Opportunities: T04: Participative team management
|
|
2007 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
|
2004 |
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W33: Installed overflow alarms or automatic shutoff valves |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2003 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2002 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W35: Installed vapor recovery systems |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2001 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W82: Modified design or composition of product |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
2000 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources Source Reduction:: W39: Other spill or leak prevention Source Reduction:: W42: Substituted raw materials Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W82: Modified design or composition of product |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1999 |
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W59: Modified stripping/cleaning equipment |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1998 |
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W59: Modified stripping/cleaning equipment |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1997 |
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W59: Modified stripping/cleaning equipment |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1996 |
Source Reduction:: W36: Implemented inspection or monitoring program of potential spill or leak sources
Source Reduction:: W42: Substituted raw materials Source Reduction:: W51: Instituted recirculation within a process Source Reduction:: W59: Modified stripping/cleaning equipment |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1995 |
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
|
1994 |
Source Reduction:: W19: Other changes in operating practices
Source Reduction:: W52: Modified equipment, layout, or piping |
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s)
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management |
The Waste Management Hierarchy |
The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes.
The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed
by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
|