Facility ID: 92704RBCTR3131W
Facility Name and Address: RBC TRANSPORT DYNAMICS CORP 3131 W SEGERSTROM AVE SANTA ANA, CA 92704 Parent Company: RBC BEARINGS INC Industry: Machine Shops (332710) Chemical: Chromium compounds (except for chromite ore mined in the Transvaal Region) |
|
Reporting Year | Section 8.10: Newly Implemented Source Reduction Activity | Section 8.10: Methods to Identify Activity | Section 8.11: Optional Pollution Prevention Information* |
---|---|---|---|
2019 |
Source Reduction:: W65: Redesigned parts racks to reduce dragout[-15-24%]
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T10: Vendor assistance Barriers: B7-Barriers to P2 B7 - No known substitutes or alternative technologies. |
W65: new racks in production reduce part nicks and dings Source Reduction - new MRP tracking of material used in part production reduce overages in material issued Source Reduction - delivery of materials used is precoordinated with suppliers to insure next day availability Barriers to P2: B7 - No known substitutes or alternative technologies. - a great deal of research is being done to fine chrome substitutes while maintaining corrosion resistance and strength |
2018 |
Source Reduction:: W65: Redesigned parts racks to reduce dragout
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T10: Vendor assistance |
W65: new plating rack tooling seals the internal part chambers to prevent plating solution from being wasted in an area it is not wanted Source Reduction - production control team insures that raw material arrives only as needed in correct quantity Source Reduction - machine suppliers assistant in best part flow determination Source Reduction: Methods for Identifying Pollution Prevention Opportunities - reduced flow time is being accomplished by a study of current operations and reposition of equipment to reduce travel distance distance |
2017 |
Other Environmental Practices: General Environmental Management - Maintain an ongoing effort to reduce scrap material in production and installed additional airborne dust control systems at individual operator work stations |
||
2016 |
Source Reduction:: W89: Other product modifications[-5-14%]
|
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) |
Source Reduction: Source Reduction - tighter inventory control to reduce waste |
2015 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers[-5-14%]
Source Reduction:: W31: Improved storage or stacking procedures[-0-4%] Source Reduction:: W52: Modified equipment, layout, or piping[-5-14%] Source Reduction:: W15: Introduced an in-line product quality monitoring or other process analysis system[-0-4%] |
Methods to Identify SR Opportunities: T04: Participative team management
Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T02: External pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other |
Source Reduction: General Environmental Management - REVISED PRODUCTION TO REDUCE WAISTED MOTIONS REMOVED UNUSED EQUIPMENT TO IMPROVE ATMOSPHERE ADDED MORE ROLLING MATERIAL CARTS TO REDUCE HANDLING OF PARTS AND SPEED PRODUCTION |
2014 |
Source Reduction:: W21: Instituted procedures to ensure that materials do not stay in inventory beyond[-5-14%]
|
Methods to Identify SR Opportunities: T03: Materials balance audits
|
Source Reduction: Source Reduction - Reduction of roughing operations required to finish the parts required less raw stock to begin machining parts |
2013 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W24: Instituted better labeling procedures Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W65: Redesigned parts racks to reduce dragout |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2012 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W24: Instituted better labeling procedures Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W65: Redesigned parts racks to reduce dragout |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2011 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W24: Instituted better labeling procedures Source Reduction:: W52: Modified equipment, layout, or piping Source Reduction:: W65: Redesigned parts racks to reduce dragout |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T05: Employee recommendation (independent of a formal company program) Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance Methods to Identify SR Opportunities: T01: Internal pollution prevention opportunity audit(s) Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2008 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices Source Reduction:: W32: Improved procedures for loading, unloading, and transfer operations |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T06: Employee recommendation (under a formal company program) Methods to Identify SR Opportunities: T11: Other Methods to Identify SR Opportunities: T03: Materials balance audits Methods to Identify SR Opportunities: T04: Participative team management Methods to Identify SR Opportunities: T10: Vendor assistance |
|
2007 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
2006 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
2005 |
Source Reduction:: W14: Changed production schedule to minimize equipment and feedstock changeovers
Source Reduction:: W19: Other changes in operating practices |
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
|
2004 |
Source Reduction:: W13: Improved maintenance scheduling, recordkeeping, or procedures
|
Methods to Identify SR Opportunities: T03: Materials balance audits
Methods to Identify SR Opportunities: T04: Participative team management |
The Waste Management Hierarchy |
The waste management hierarchy established by the Pollution Prevention Act (PPA) guides waste generators toward the best options for managing wastes.
The preferred option is to prevent pollution at its source, but for waste that is generated, the preferred management methods are recycling, followed
by burning for energy recovery, treatment and, as a last resort, disposing of the waste.
|